Traffic details determine the specification

Describe the forklifts, wheel types, approximate loaded weights and frequency of movement. A coating specified for foot traffic may not be suitable for repeated heavy turning or hard wheels. Loading docks, picking aisles and stationary storage zones can face very different wear patterns.

Inspect joints, surface damage and turning zones

Forklift movement across damaged joints can accelerate edge deterioration. Turning and braking areas may show concentrated abrasion, while contamination can affect the coating bond. Record potholes, spalling, existing repairs and any movement. Structural defects may require specialist assessment before a coating is considered.

Balance operational safety and cleaning

Discuss slip resistance, cleaning equipment, oils and chemicals, and whether marking or zoning is required. Traction needs depend on the conditions in each area. Ask the contractor what is included in the coating scope and coordinate separate safety marking requirements if needed.

Plan shutdowns around actual return-to-service times

Map the routes that need to stay operational and identify alternative storage and traffic arrangements. Allow for preparation, repairs and the full product-specific cure before forklift access. Send the floor plan, photos, approximate square metres, suburb, traffic details and preferred shutdown dates for a practical quote discussion.

Frequently asked questions

Can forklifts drive on newly coated floors immediately?

No. Follow the specified cure and load limits before returning equipment to service.

Can a warehouse be coated in stages?

Staged work may be possible depending on access, boundaries, safety controls and the selected system.

MELBOURNE & MORNINGTON PENINSULA

Get advice for your floor.

Send photos, approximate square metres and your suburb. We can discuss the preparation and finish options for your project.

General planning guidance only. Suitability, pricing, compliance and installation details depend on site assessment and the specified system.